W.Tech RAA Series Manuel d'instructions Page 6

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 16
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 5
Pag5
3. INSTALLATION
3.1 Towerfoundationandanchoring
Ourunitshavenoneedsofanyspecialfoundation.Theycanbeplaceddirectlyontoaconcreteslaborontoconcretecoatedground,
makingsureinallcasesthattheanchoringiscapableofresistingtheoperating loaddistributedbythetowerbedframe.Theycanbe
anchoredon twosteel beams,allal
ongthe basin.This anchoringcan beobservedinfig.3 andwill needsome boltsandnutstobe
fitted.
Inanycase,thesurfacehastobeperfectlylevelbeforeinstallingthetower.Thetowermustnotbelevelledusingwedgesoranyother
elementbetw
eenthebeamsandthebasin,becauseitwillnotgiveadequatelongitudinalsupport.

 Fig.3
3.2 Locationconditions
Thetowermustneverbelocatedinanareathatisenclosedonallfoursides.
Sufficientclearancemustbeprovidedallaroundthetower,sothattheco
ldairmaycirculateataspeedlowerthanthatofthehotair
outletstream.Therefore,thispassagesectionmustbeequalinsizeorbiggerthanthebaseplansectionofthetower.
Anyobstacleabovethetowerataheightlowerthanthatofthetallestsideofthetowersh
allbeavoided.
Sufficientspacemustbeprovidedaroundthetowertoallowaccesstoallpartsrequiringmaintenance.Seefig4.
 Fig.4
Vue de la page 5
1 2 3 4 5 6 7 8 9 10 11 ... 15 16

Commentaires sur ces manuels

Pas de commentaire