Installation and maintenance manual Closed circuit evaporative cooler Axial type Series RAA W-Tech S.r.l. Via Moglio, 18/2 - 40037 Sasso Ma
Pag9Thefollowingconditionsmustbemaintainedinordertoeliminatethem:• Ryznarindex= 2 pHs‐pHcbetween6and 7. Where pHsisthe
Pag107. GENERALMAINTENANCEINSTRUCTIONS Duetothequalityoftheseunits,maintenancerequirementsareminimal.Nevertheless,theywillbei
Pag11 Fig.10 7.1.6 Coil Thecoilhastobeobservedregularly.Ithastobeconsideredthatthisisake
8.- PREVENTIVE MAINTENANCE SUMMARY CHART OPERATIONS TO BE CARRIED OUT BLOWDOWN GRID BASIN WATER MAKE-UP ELECTRIC PUMP WATER DISTRIBUTION DRIFT E
9. TROUBLESHOOTING CHART DEFECT POSSIBLE CAUSE ACTION TO BE TAKEN MOTOR ROTATES IN OPPOSITE DIRECTION Error in connection. Change two phases in
Caratteristiche raccomandate acqua Recommended water charachteristic Caractéristiques de l’eau recommandées Minimale Wassereigenschaften Ре
W-Tech S.r.l. Management and Administration: Via Moglio 18/2 – 40037 Sasso Marconi (BO) – ITALY T: +39 05
Pag1 TABLEOFCONTENTS1. MACHINERYDESCRIPTION 2 1.1 Generalsafetyuse 1.2 Generaldescription 2 1.3 PrimaryCircuit. 2 1.4
Pag21. GENERALSAFETYRULESANDMACHINERYDESCRIPTION1.1 GeneralSafetyuse:Thecontentofthismanualistobeconsideredasanintegration
Pag3 1.6 CasingandwatercollectionbasinThebodyoftheunitismanufacturedin“Sendzimir”galvanisedsteelcoveredwith300g/m2zinclayer
Pag42. DELIVERYANDHANDLING2.1 DeliverymethodAllmodelsofthisseriesaredeliveredwiththemaximumpossibleelementsmountedinourfact
Pag53. INSTALLATION3.1 TowerfoundationandanchoringOurunitshavenoneedsofanyspecialfoundation.Theycanbeplaceddirectlyontoac
Pag63.3 AssemblyofthebodiesBeforebeginningtheassemblyonsite,checkthatallelementsdeliveredinsidethebasinhavebeenremoved.Toa
Pag7Theassemblycouldhehelped bymeansofpointers,whichwillbeinsertedintheholesinthelowerbodyjustbeforetheupperoneisallowe
Pag84. OPERATIONSTOBECARRIEDOUTBEFORETHESTARTUP 4.1 Cleaning• Makesurethatthedistributionsystemiscleanandthatthedistribu